• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Viscose Filament Yarn Spinning by Spool Process: A Promising Business Opportunity for Startups and Entrepreneurs
Viscose Filament Yarn Spinning by Spool Process: A Promising Business Opportunity for Startups and Entrepreneurs

 

Read More

Capacity :
Viscose Filament Yarn - 30D: 2 MT Per Day Viscose Filament Yarn - 40D: 2 MT Per Day Viscose Filame
Plant and Machinery cost:
27900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
46500.00Lakhs
Add To Inquiry Basket
Cashew Nut Processing with Flavoured Cashew: A Lucrative Business Opportunity for Entrepreneurs
Cashew Nut Processing with Flavoured Cashew: A Lucrative Business Opportunity for Entrepreneurs

 

Read More

Capacity :
White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut 200 Kgs
Plant and Machinery cost:
77.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
198.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns & Drapes) Manufacturing Business
Medical Disposables (Gowns & Drapes) Manufacturing Business

Rapid advancements in medical technology and hygiene standards have driven demand for medical disposables such as... Read More

Capacity :
Medical Gowns: 1,000 Pcs Per Day Medical Drapes (Customarized): 1,000 Pcs Per Day HIP U Dr
Plant and Machinery cost:
388.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
632.00Lakhs
Add To Inquiry Basket
Viscose Filament Yarn Spinning by Centrifugal Process
Viscose Filament Yarn Spinning by Centrifugal Process

Viscose filament yarn (VFY) is an important raw material for many textile applications such as weaving, embroider... Read More

Capacity :
Viscose Filament Yarn - 30D: 2 MT Per Day Viscose Filament Yarn - 40D: 2 MT Per Day Viscos
Plant and Machinery cost:
27800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
46300.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch

Environmentally friendly alternatives to conventional plastic... Read More

Capacity :
Biodegradable Plastic Bags (Per Bag 25 gms Size) 12 MT per day
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1498.00Lakhs
Add To Inquiry Basket
How to Setup Lawn Tennis Ball Plant
How to Setup Lawn Tennis Ball Plant

Tennis is a well-known sport, and the little, spherical, fuzzy yell... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan  Cosmetic Unit (Serum, Cream & Shampoo)
A Business Plan Cosmetic Unit (Serum, Cream & Shampoo)

A cosmetic unit typically includes a serum, cream, and shampoo that work together to hydrate, nourish, and protect your skin and hair. Serums are l... Read More

Capacity :
Serum 199,992 Nos Per Annum Cream 600,000 Nos Per Annum Shampoo 600,000 Nos Per Annum
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Tin From Cassiterite
Start Manufacturing Business Of Tin From Cassiterite

Tin is an important metal that has played a crucial role in our society for centuries... Read More

Capacity :
Tin Ingot 6 MT Per Day
Plant and Machinery cost:
616.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
2279.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan Nonwoven Fabric For Mattress
A Business Plan Nonwoven Fabric For Mattress

 

Nonwoven fabric f... Read More

Capacity :
Nonwoven Fabric 400,000 Sq.mtrs. per day
Plant and Machinery cost:
797.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2297.00Lakhs
Add To Inquiry Basket
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)

 

A variety of meth... Read More

Capacity :
-
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
878.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)

Semi Processed Canned Veget... Read More

Capacity :
Canned Chickpeas 1 Kg each 5,000 Th.Packs Per Annum Canned Red Kidney Beans 1 Kg each 5,000 Th.Pa
Plant and Machinery cost:
271.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1398.00Lakhs
Add To Inquiry Basket
Business Plan For Silica From Rice Husk Ash
Business Plan For Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and... Read More

Capacity :
-
Plant and Machinery cost:
746.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1327.00Lakhs
Add To Inquiry Basket
Start Production of Activated Carbon From Bamboo
Start Production of Activated Carbon From Bamboo

 

Activated carbon ... Read More

Capacity :
Activated Carbon 750 MT per Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
546.00Lakhs
Add To Inquiry Basket
A Business Plan For Light Weight Bricks (EPS Bricks)
A Business Plan For Light Weight Bricks (EPS Bricks)

Light weight bricks, also k... Read More

Capacity :
EPS Light Weight Bricks 200 Cu.Mt. Per Day
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
737.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Carton Boxes
Start Manufacturing Business Carton Boxes

Carton boxes, also known as corrugated boxes, are commonly us... Read More

Capacity :
Carton Boxes 20 MT Per Day
Plant and Machinery cost:
213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1023.00Lakhs
Add To Inquiry Basket
Start Business Of Recycled Polyester Fiber From Used PET Bottles
Start Business Of Recycled Polyester Fiber From Used PET Bottles

Recycled polyester fiber is... Read More

Capacity :
Recycled Polyester Fiber 5,000 Kgs. Per Day
Plant and Machinery cost:
68.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
A Business Plan  Copper Cathode From Copper Scrap
A Business Plan Copper Cathode From Copper Scrap

Copper cathode is a pure form of copper metal that is produce... Read More

Capacity :
Copper Cathode 1,800 MT Per Annum Copper Slag, Residue 180 MT Per Annum
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
954.00Lakhs
Add To Inquiry Basket
Start  Electrolytic Manganese Dioxide Business
Start Electrolytic Manganese Dioxide Business

Electrolytic Manganese Diox... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Setup Sitagliptin (API) Business
Setup Sitagliptin (API) Business

 

Sitagliptin API, ... Read More

Capacity :
Sitagliptin 10 MT Per Day By Products 10 MT Per Day
Plant and Machinery cost:
377.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
5217.00Lakhs
Add To Inquiry Basket
Start Cardanol Business From Cashew Nut Shell Liquid
Start Cardanol Business From Cashew Nut Shell Liquid

Cardanol is a naturally occ... Read More

Capacity :
Cardanol 30 MT Per Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
710.00Lakhs
Add To Inquiry Basket
Start Business Of Cold Storage
Start Business Of Cold Storage

Cold storage refers to a me... Read More

Capacity :
Fruits, Vegetables, Pulses & Spices Store 5000 MT
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
713.00Lakhs
Add To Inquiry Basket
Start Layer Feed Production
Start Layer Feed Production

Layer feed is a specially formulated feed given to laying hens to ensure their ... Read More

Capacity :
-
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1655.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Safety Shoes
Start Manufacturing Of Safety Shoes

Capacity :
Safety Shoes 2,000 Pairs Per Day
Plant and Machinery cost:
113.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
672.00Lakhs
Add To Inquiry Basket
Start IV Cannula Manufacturing Unit (Pen Style)
Start IV Cannula Manufacturing Unit (Pen Style)

An IV (Intravenous) Cannula, particularly the "Pen Style," is a medical device used for admini... Read More

Capacity :
-
Plant and Machinery cost:
1284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
5103.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of  Disposable Plastic Syringes
Start Manufacturing Business Of Disposable Plastic Syringes

Disposable plastic syringes... Read More

Capacity :
-
Plant and Machinery cost:
245.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
1811.00Lakhs
Add To Inquiry Basket
Start Business of Solid Rubber Tyres
Start Business of Solid Rubber Tyres

 

Read More

Capacity :
-
Plant and Machinery cost:
1234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4428.00Lakhs
Add To Inquiry Basket
Opportunity in Paint Rollers Business
Opportunity in Paint Rollers Business

 

Paint rollers are... Read More

Capacity :
Paint Roller 12,000 Pcs. Per Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)

 

Indian culture has a very long history with sp... Read More

Capacity :
300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
44.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
Floral Foam (Phenolic Foam) with Resin Manufacturing Business
Floral Foam (Phenolic Foam) with Resin Manufacturing Business

 

Floral foam, also known as phenolic foam, is a lightweight, highly porous foam material used to hold and hyd... Read More

Capacity :
Floral Foam (Phenolic Foam): 90,000 Kg. Per Annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
366.00Lakhs
Add To Inquiry Basket
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

Glass Fiber Reinforced Polymer (GFRP) Rebar is a type of composite material that is made from combining glass fibers with a polymer matrix. This co... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6097.00Lakhs
Add To Inquiry Basket
Start Polyvinyl Alcohol Production business
Start Polyvinyl Alcohol Production business

Polyvinyl Alcohol (PVOH) is a synthetic polymer created through the polymerization of vinyl acetate. It is a water-soluble ... Read More

Capacity :
Polyvinyl Alcohol: 6,000 MT Per Annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1193.00Lakhs
Add To Inquiry Basket
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment

Paul Vaulting, an innovator... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Yeast  From Molasses
A Business Plan for Yeast From Molasses

Yeast from mol... Read More

Capacity :
Cream Yeast: 3,600 MT Per Annum Powder Yeast: 1,500 MT Per Annum
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2900.00Lakhs
Add To Inquiry Basket
Start-up Production of Latex Mattress
Start-up Production of Latex Mattress

 

Late... Read More

Capacity :
Latex Mattress Size: 38" x 75" (33Kg): 9,091 Nos. Per Annum
Plant and Machinery cost:
77.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
A Business Plan For Zeolite 4a (Detergent Grade)
A Business Plan For Zeolite 4a (Detergent Grade)

Zeolite 4A is ... Read More

Capacity :
Zeolite 4a (Detergent Grade): 3,000 MT Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
688.00Lakhs
Add To Inquiry Basket
A Business Plan for Lithium Ion Battery (Battery Assembly)
A Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion ... Read More

Capacity :
-
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
516.00Lakhs
Add To Inquiry Basket
Start Production Of Glass Sheet
Start Production Of Glass Sheet

Glass sheet is a type of glass that has been pro... Read More

Capacity :
Glass Sheet: 1,500,000 Sq.mt. Per Annum
Plant and Machinery cost:
9000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
12900.00Lakhs
Add To Inquiry Basket
India Sugarcane Bagasse Biodegradable Disposable Tableware Market
India Sugarcane Bagasse Biodegradable Disposable Tableware Market

Sugarcane Bagasse Biodegradable Disposable Tableware is a typ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A business plan  For Cardanol From Cashew Nut Shell Oil
A business plan For Cardanol From Cashew Nut Shell Oil

 

Card... Read More

Capacity :
Cardanol 24 MT Per Day
Plant and Machinery cost:
152.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
658.00Lakhs
Add To Inquiry Basket
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)

Truck trailers are an essential part of any frei... Read More

Capacity :
-
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)

Premix Tea and... Read More

Capacity :
-
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
119.00Lakhs
Add To Inquiry Basket
Start production of Biodegradable Disposable  Cups and Plates (Tableware) Using Sugarcane Bagasse
Start production of Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

Bagasse is the fibrous residue that remains afte... Read More

Capacity :
-
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
2687.00Lakhs
Add To Inquiry Basket
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant

 

Product:

<...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Ceramic Wall and Floor Tiles
Start Production of Ceramic Wall and Floor Tiles

Ceramic wall and floor tiles are a popular choice for a wide variety of applications, from residential to... Read More

Capacity :
Ceramic Wall & Floor Tiles 6,000 Sq.MT. Per Day
Plant and Machinery cost:
2724.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
5543.00Lakhs
Add To Inquiry Basket
A Business Plan  For Tantalum Powder from Tantalite Ore
A Business Plan For Tantalum Powder from Tantalite Ore

Tantalum is a rare transition metal that is mined from columbite-tantalite, which is an ore found in vari... Read More

Capacity :
Tantalum Powder 4 MT Per Day
Plant and Machinery cost:
235.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1935.00Lakhs
Add To Inquiry Basket
Setup Plant OF Mica Powder From Mica Deposits
Setup Plant OF Mica Powder From Mica Deposits

Mica powder is a fine, powdery mineral that is made from mica deposits. Mica is a type of natural rock th... Read More

Capacity :
Mica Powder 40 MT Per Day
Plant and Machinery cost:
296.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2684.00Lakhs
Add To Inquiry Basket
Setup plant  Of Ferric Pyrophosphate (Food Grade and Pharma Gade)
Setup plant Of Ferric Pyrophosphate (Food Grade and Pharma Gade)

Ferric pyrophosphate is a phosphate-iron compound that is used as a food additive, dietary supplement and in p... Read More

Capacity :
Ferric Pyrophosphate Anhydrous 420 MT Per Annum (Food Grade) Ferric Pyrophosphate Nonhydrate 1
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Start Industry Of Chocolate
Start Industry Of Chocolate

Chocolate is a universally beloved food item made from cocoa ... Read More

Capacity :
Chocolate 1,000 Kg. Per Day
Plant and Machinery cost:
120.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
815.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Best Plan of Tennis Racke... 0 0.00 0.00
A Business Plan for Silic... 0 23.00 1288.00
Manufacturing Business Of... 0 34.00 324.00
Red Chilli Oleoresin Manu... Chilli Oleoresin 6,250 Kg Per Day 25.00 3250.00
Start a Business of Low R... Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC) 25.00 5370.00
Moringa Leaf Powder Produ... Moringa Leaf Powder 1,000 Kg Per Day 29.00 189.00
Manufacturing Business Al... Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day 26.00 72100.00
Production Business Of Me... MDPE Pipes 5,400 Kgs per day 27.00 376.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Manufacturing Business of... 0 0.00 0.00
Plant of Red Chili Oleore... 0 0.00 0.00
The Fuel of the Future Co... 0 0.00 0.00
Copper Powder Using Elec... 1,20,000 Kgs Per Annum 27.00 338.00
ISO Freight Containers 15,000 Nos. Per Annum 15,000 Nos. Per Annum 12.00 9658.00
Manufacturing Business of... 5,000 MT Per Annum 28.00 1287.00
Start a Business Of Ethyl... 30,000 MT Per Annum 28.00 7206.00
Manufacturing Plant of Co... 0 0.00 0.00
Most Profitable Business ... 0 0.00 0.00
Manufacturing Business pl... 0 36.00 2890.00
Start manufacturing busin... 0 29.00 496.00
Lucrative Business of Lit... 0 0.00 0.00
Automated Vehicle Scrappi... 0 0.00 0.00
Investment opportunity in... 25000 Nos/day 25.00 4626.00
Start Manufacturing of Me... Medical Gowns 1,250 Pcs Per Day Medical Drapes 1,250 Pcs Per Day 26.00 611.00
Active Pharma Ingredients... Metformin 2,000 Kgs. Per Day Ciprofloxacin 1,000 Kgs. Per Day 31.00 584.00
Profitable Business of Li... Lithium Ion Battery Module Cap. 0.4 KWH 595.2 Module per day Lithium Ion Battery Module Cap. 4.8 K 27.00 5000.00
How to Start Production o... 0 0.00 0.00
Business Ideas and Opport... 0 0.00 0.00
Production of 7-Aminoceph... 7-Aminocephalosporanic Acid: 2 MT / Day 28.00 3419.00
Business Plan for Lithium... 48 Volt, 60 AH Lithium-Ion Battery Pack : 5 Nos / Day 48 Volt, 80 AH Lithium-Ion Battery Pack : 5 No 28.00 648.00
12345678910...

Showing 481 - 540 of 678 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.